Site description
Treated quantity60 tof PFAS-contaminated soil
Thermal technologyContainerized Thermal Treatment (CSTT)
Main contaminantPFAS
Site challengesPersistent PFAS in low-permeability soil, to be destroyed rather than transferred
Project timelineDemonstration campaign, 2025

Solution
- Treatment methodContainerized conductive heating with Re-Burn
- Treatment programTwo demonstration batches of about 30 t each
- Contaminated vapour managementPFAS vapours reinjected into the Re-Burn chamber above 1,400°C for on-site mineralisation
- Process controlTemperature, vapour extraction and combustion monitoring; independent laboratory analyses of soil, leachate and air

Results
Extracted PFAS destroyed in the Re-Burn chamber
PFAS emissions below laboratory detection limits
> 1,400°Cmineralisation temperature of the PFAS vapours

Reference sheet
Technical summary of this project, sent on request.