Site description
Recovered product1,136 Lof kerosene
TechnologyLNAPL skimming (Surfer)
Main contaminantKerosene
Site challengesStrict security procedures and minimal disruption to ongoing operations
Project timelineMay 2023 – September 2024

Solution
- Treatment methodDynamic LNAPL recovery with skimmers
- Treatment program3 skimmers installed at 12 m depth
- PumpingPLC adjusting the pumping cycles for continuous operation
- Process controlMonthly visits to manage the LNAPL level

Results
1,136 Lof kerosene recovered
Automated groundwater pumping and skimming
Operations maintained on an active site

Reference sheet
Technical summary of this project, sent on request.