Skip to Content

Dynamic LNAPL Recovery for Hydrocarbon-Impacted Sites in Angleur, Belgium

Long-term recovery of free-phase hydrocarbons using Dynaskim® technology to remediate historical fuel contamination caused by leaking storage tanks and service stations. The solution combines automated groundwater pumping and dynamic skimming to maximize hydrocarbon recovery while minimizing operational requirements.

Site description

Spill volumeA few to tens of m³per site, near or under storage tanks
TechnologyLNAPL skimming
Main contaminantHeating oil, diesel, petrol
Site challengesHistoric or accidental leaks from heating oil tanks and service stations
Project timeline2019
Project site

Solution

  • Treatment methodDynamic LNAPL recovery with skimmers
  • Treatment programSmall pumping units (DS 500-6/125 or DS 100-5) linked to SKIM 2-25 or SKIM 4-25 skimmers
  • PumpingAutomated groundwater pumping combined with free-product recovery
  • Process controlPumping cycles adjusted to the free-phase thickness
Treatment on site

Results

Continuous recovery of free-phase hydrocarbons
Automated groundwater pumping and skimming
Historic fuel contamination addressed with limited operating requirements
Site during or after treatment

Reference sheet

Technical summary of this project, sent on request.

Facing a similar site?

Send us your site details and our team will prepare a tailored proposal.

Get a Quote