Site description
Treated volume79 m³of contaminated soil
Thermal technologyEx-Situ Treatment (Applied Onsite)
Main contaminantHydrocarbons
Site challengesFormer military base in Greenland; three hydrocarbon fractions treated in parallel
Project timeline2019

Solution
- Treatment methodEx-situ treatment in a sheet-pile container divided into 3 parts
- Treatment program6 heating tubes, target temperature 325°C
- Contaminated vapour managementGas emissions respected throughout the treatment
- Process controlKinetic study with sampling across the container

Results
Contamination reduction C6-C15: 95.7% - C10-C20: 98.2% - C20-C35: 99.9%
20 daystreatment time
Fully compliant air emissions

Reference sheet
Technical summary of this project, sent on request.