SITE DESCRIPTION
Treated Volume | 79 m³ of contaminated soil |
Thermal technology | Ex-Situ Treatment (Applied Onsite) |
Main contaminant | Hydrocarbons |
Site challenges |
Operating in a remote Arctic environment with limited logistics and infrastructure,
treating various hydrocarbon fractions
|
Project Timeline | 2019 |

SOLUTION
Treatment Method | On-site thermal remediation using Smart Burners fueled with diesel |
Treatment program | Contenerized traitement using 6 heating tubes |
Contaminated Vapors Management | Reburn |
Process control | Continuous temperature monitoring into the soil throughout the treatment |

RESULTS
✅ Contamination reduction C6-C15: 95.7% - C10-C20: 98.2% - C20-C35: 99.9% |
✅ Treatment time : 20 days |
✅ Fully compliant air emissions |