SITE DESCRIPTION
Treated Volume |
65 m³ of contaminated soil
|
Thermal technology |
In-Situ Thermal Desorption (ISTD) |
Main contaminant |
Hydrocarbons
|
| Site challenges |
Contaminated area located in an enclosed school courtyard surrounded by buildings and adjacent to a high-voltage electrical cabin |
Project Timeline | 10 weeks |
SOLUTION
Treatment Method |
In-Situ Thermal Desorption |
Treatment program | Treatment of 65 m³ (118.8 tonnes) using 5 heating tubes with a target temperature of 200°C |
Contaminated Vapors Management |
Off-gases extracted and discharged above the surrounding buildings. Emissions continuously monitored |
Process control | Continuous temperature and emissions monitoring throughout the treatment to achieve the remediation target while ensuring safe operation in a confined urban environment |

RESULTS
✅ Hydrocarbon concentrations reduced below the remediation target of 300 mg/kg |
✅ Successful remediation completed within a constrained urban school environment |
✅ Atmospheric emissions remained compliant throughout the entire treatment process |