Site description
Treated volume65 m³of contaminated soil (118.8 t)
Thermal technologyIn-Situ Thermal Treatment
Main contaminantMineral oil (up to 2,000 mg/kg)
Site challengesSchool courtyard surrounded by buildings, next to a high-voltage cabin
Project timeline2014

Solution
- Treatment methodCompact in-situ installation in insulated containers
- Treatment program5 heating tubes, target temperature 200°C, 35 days of heating
- Contaminated vapour managementExhaust gases discharged above the surrounding buildings, within the discharge standards
- Process controlGas analyser (NOx, CO, CO2, O2, SO2, HC) and Pitot tube for the flow rate

Results
TPH below the target (<300 mg/kg DM)
35 daysheating time
Discharge standards met throughout the treatment

Reference sheet
Technical summary of this project, sent on request.