Site description
Treated volume1,024 m³of contaminated soil (1,946 t)
Thermal technologyIn-Situ Thermal Treatment
Main contaminantTPH (former petrol station)
Site challengesGroundwater close to the treatment zone limited the temperature rise at 8 m depth
Project timeline2017

Solution
- Treatment methodIn-situ thermal treatment with Re-Burn
- Treatment program19 gas burners and 19 secondary heating tubes over 128 m², target temperature 220°C
- Contaminated vapour managementRe-Burn; low and stable CO concentrations in the emissions
- Process controlSoil temperature, burner outlet temperature (450–500°C) and negative soil pressure

Results
< 50 mg/kgTPH after treatment (target 50 mg/kg)
90 daysheating time
Initial maximum concentration: 3,170 mg/kg DM