SITE DESCRIPTION
Treated Volume | 1,022 m³ of contaminated soil |
Thermal technology | In-Situ Treatment |
Main contaminant | Hydrocarbons, BTEX |
| Site challenges | 13 m below ground level, groundwater located close to the heating tubes, generating heat losses |
Project Timeline | 2017 |

SOLUTION
Treatment Method |
In-Situ treatment using 13 heating tubes |
Treatment program | Target temperature 220°C during 57 days |
Contaminated Vapors Management | Reburn |
Process control | Continuous temperature monitoring into the soil throughout the treatment |

RESULTS
✅ Reduced contaminant mass from 5,000 kg to 8 kg |
✅ Achieved remediation target of <100 mg/kg DM |
✅ Average soil temperature reached 255°C after 57 days |