Site description
Pile volume2,000 m³per pile (3,600 t)
Thermal technologyEx-Situ Thermal Treatment
Main contaminantTHC (C10–C40) up to 21,800 mg/kg, PAH up to 1,140 mg/kg
Site challengesSoils from several industrial sites treated on a waste processing platform
Project timeline2023 – ongoing (2 to 3 piles per year)

Solution
- Treatment methodEx-situ thermal treatment piles with Re-Burn
- Treatment program75 gas burners per pile, target temperature 250°C, 75 days per pile
- Contaminated vapour managementRe-Burn
- Process controlSoil temperature at cold points, soil pressure, combustion gases and chimney emissions

Results
All samples below targets: C10–C40 500 mg/kg, PAH 50 mg/kg
75 daystreatment time per pile
Treated soil placed in the adjacent landfill

Reference sheet
Technical summary of this project, sent on request.