Large-Scale Hydrocarbon Soil Remediation by ESTT

Soils from regional industries are treated at the Lingenheld platform in Oberschaeffolsheim, France, in Ex-Situ Thermal Treatment piles of 2,000 m³; all samples met the hydrocarbon and PAH targets.

Site description

Pile volume2,000 m³per pile (3,600 t)
Thermal technologyEx-Situ Thermal Treatment
Main contaminantTHC (C10–C40) up to 21,800 mg/kg, PAH up to 1,140 mg/kg
Site challengesSoils from several industrial sites treated on a waste processing platform
Project timeline2023 – ongoing (2 to 3 piles per year)
Project site

Solution

  • Treatment methodEx-situ thermal treatment piles with Re-Burn
  • Treatment program75 gas burners per pile, target temperature 250°C, 75 days per pile
  • Contaminated vapour managementRe-Burn
  • Process controlSoil temperature at cold points, soil pressure, combustion gases and chimney emissions
Treatment on site

Results

All samples below targets: C10–C40 500 mg/kg, PAH 50 mg/kg
75 daystreatment time per pile
Treated soil placed in the adjacent landfill
Site during or after treatment