Site description
Treated volume420 m³of contaminated soil (756 t)
Thermal technologyIn-Situ Thermal Treatment
Main contaminantTPH (C10–C40) in soil and groundwater
Site challengesHistoric motor oil leak beneath the Haemers Technologies headquarters; soil and groundwater treated together
Project timelineMarch 2020 – March 2021

Solution
- Treatment methodIn-situ thermal treatment with Re-Burn
- Treatment program2 batches of 45 burners (propane, natural gas and diesel), target temperature 250°C
- Contaminated vapour managementRe-Burn; emissions controlled with gas analysers
- Process control21 temperature probe wells (1, 3.5 and 4.5 m) and 8 pressure wells

Results
TPH < 300 mg/kg in soil and < 300 µg/L in groundwater
46 + 55 daysheating time (batch 1 + batch 2)
Cross-contamination to the water table stopped