Site description
Recovered product> 93 m³of pure product
TechnologyLNAPL skimming
Main contaminantHydrocarbons, BTEX, aromatic and aliphatic compounds
Site challengesAquifer at 12 m with fast 2.5 m variations induced by a nearby river
Project timeline2010–2019

Solution
- Treatment methodLong-term LNAPL recovery in a petrochemical unit
- Treatment program2 DS 500-6D ATEX pumping units and 8 SKIM 4-250 skimmers
- StorageEach pumping unit connected to a 5,000 L ST 5000 storage unit
- Process controlOperation controlled by the groundwater level; skimmers follow 2.5 m variations

Results
> 93 m³pure product recovered over about four years
Continuous operation despite groundwater variations of 2.5 m
Free phase from a few centimetres to several tens of centimetres addressed over a large surface

Reference sheet