Site description
Treated area463 m²in 5 batches
Thermal technologyIn-Situ Thermal Treatment (Hot Screws)
Target speciesJapanese knotweed (Fallopia japonica)
Site challengesEradication before bridge demolition and roundabout works; winter, utility line and slope
Treatment period87 days (2025)

Solution
- Treatment methodIn-situ heating with Hot Screws
- Heating configuration242 Hot Screws over 5 zones (52 to 110 m²)
- Treatment targetMinimum 50°C for 3 days
- Process controlThermocouples at 0.5, 1 and 1.5 m depth and handheld thermometer below the surface

Results
463 m²treated in five batches
Completed before the start of civil works in May 2025
Treatment carried out despite winter conditions, a utility line and a slope

Reference sheet