SITE DESCRIPTION
Treated area | 463 m² |
Thermal technology | In-Situ Thermal Treatment (ISTT) |
Main contaminant | Japanese Knotweed (Fallopia japonica) |
Site challenges |
Eradication of invasive rhizomes prior to bridge demolition and roundabout construction, while working during winter conditions, around utility networks and on sloped terrain.
|
Heating configuration | Five treatment batches covering a total of 463 m², using 242 Hot Screws™ to ensure complete thermal coverage of the infested areas. |
Treatment Duration |
87 days (2025) |
RESULTS
✅ 463 m² of Japanese knotweed successfully treated across five thermal batches. |
✅
Treatment completed within the required schedule before the start of civil engineering works. |
✅ Successful thermal eradication despite winter conditions, utility constraints and sloping terrain. |