SITE DESCRIPTION
Treated Volume | 12,000 m³ of contaminated soil |
Thermal technology | Ex-Situ Treatment (Applied Onsite) |
Main contaminant | Hydrocarbons, BTEX, PAHs, residual explosive compounds |
Site challenges |
treatment of hydrocarbons and residual explosive compounds,
Maintaining compliant emissions throughout a 9-month
|
Project Timeline | 2019 |

SOLUTION
Treatment Method | Multiple ESTD treatment piles |
Treatment program | Simultaneous operation of 3 treatment piles using75 heating tubes per pile |
Contaminated Vapors Management | VTU |
Process control | Continuous temperature monitoring into the soil throughout the treatment |

RESULTS
✅ Successfully remediated 12,000 m³ |
✅ Treatment time : reduced from 53 to 39 days |
✅ Treatment batches were validated and accepted by the client |