Site description
Recovered product11 m³of pure product
TechnologyLNAPL skimming (dynamic vacuum)
Main contaminantHydrocarbons, BTEX, phenols, chlorobenzenes, VOC
Site challengesViscous free phase up to 7 m thick in a chalk aquifer at 22 m depth
Project timeline2012, about 3 years of operation

Solution
- Treatment methodDynamic vacuum skimming
- Treatment programDS 500-12D pumping unit linked to SKIM 2-25 and SKIM 4-25 skimmers in 8 wells
- Product managementSettling and storage unit added to reduce handling and treatment costs
- Process controlOperation adapted to the seasonal aquifer variation of 2.5–3.0 m

Results
Free phase reduced from up to 7 m to less than 10 cm in all wells
11 m³pure product recovered over about three years
9.5 L/dayaverage pure product pumping

Reference sheet
Technical summary of this project, sent on request.