SITE DESCRIPTION
Treated Volume | 138 m³ of contaminated soil (248.4 T) |
Thermal technology | In-Situ Treatment (ISTD, pilot) |
Main contaminant | PCB (polychlorinated biphenyls) |
Site challenges | Rio Tinto site with PCB impact over a 5.5 m thick layer; humid and saturated zones required extended treatment time |
Project Timeline | 2013 |

SOLUTION
Treatment Method |
Pilot In-Situ Thermal Desorption (138 m³ / 248.4 T) |
Treatment program | 14 heating tubes, target temperature 200°C |
Contaminated Vapors Management | Cooling, condensation and activated carbon |
Process control | Humid zones treated in 9 weeks, non-humid zones in 5 weeks · continuous temperature and air quality monitoring |

RESULTS
✅ 138 m³ of contaminated soil treated (pilot scale). |
✅ PCB concentration reduced from up to 5,900 mg/kg to below the 10 mg/kg target |
✅ Pilot results validated for Rio Tinto, confirming feasibility ahead of full-scale application at the site |