Site description
Treated quantity12,000 tof impacted sand
Thermal technologyEx-Situ Treatment (Applied Onsite)
Main contaminantHydrocarbons
Site challengesCrude oil contamination, average 15,000 mg/kg TPH (max. 65,000 mg/kg)
Project timeline2013

Solution
- Treatment methodOn-site thermal remediation using Smart Burners™ technology
- Treatment program6 batches of approximately 2,000 tonnes each
- Heat recoveryHot air from the batch being treated is reused to pre-heat the next batch
- Heating234 heating tubes, target temperature 250°C

Results
3,660 mg/kgTPH after 28 days of heating (pilot)
30 daysheating time per batch
Treatment target: <5,000 mg/kg TPH

Reference sheet
Technical summary of this project, sent on request.