Skip to Content

Remediation of Heavy Hydrocarbon Contamination at Kinkasi Oil Refinery, DR Congo

Following refinery operations, 12,000 tonnes of sand contaminated with heavy hydrocarbons were remediated in six batches of 2,000 tonnes by Ex-Situ Thermal Treatment, in a remote location.

Site description

Treated quantity12,000 tof impacted sand
Thermal technologyEx-Situ Treatment (Applied Onsite)
Main contaminantHydrocarbons
Site challengesCrude oil contamination, average 15,000 mg/kg TPH (max. 65,000 mg/kg)
Project timeline2013
Project site

Solution

  • Treatment methodOn-site thermal remediation using Smart Burners™ technology
  • Treatment program6 batches of approximately 2,000 tonnes each
  • Heat recoveryHot air from the batch being treated is reused to pre-heat the next batch
  • Heating234 heating tubes, target temperature 250°C
Thermal treatment on site

Results

3,660 mg/kgTPH after 28 days of heating (pilot)
30 daysheating time per batch
Treatment target: <5,000 mg/kg TPH
Site after treatment

Reference sheet