Site description
Treated volume288 m³of contaminated soil (524 t)
Thermal technologyIn-Situ Thermal Treatment
Main contaminantPCE/TCE; oil also present
Site challengesTreatment directly beneath a high-voltage transformer of a power station
Project timeline2016

Solution
- Treatment method15 heating tubes (8.8–9.2 m) and 24 steam tubes connected to an extraction system; propane burners
- Treatment programPit of 6 × 6 m, 1 m deep; target temperature 88°C; 42 days of heating
- Contaminated vapour managementNon-condensable gases burned to meet discharge standards; condensate collected and treated at the GEO facility
- Process controlAnalysis of gases and condensate during treatment

Results
No chlorinated solvent residues detected in the soil
288 m³treated soil volume
Chlorinated solvent target (<0.1 mg/kg) achieved

Reference sheet
Technical summary of this project, sent on request.