SITE DESCRIPTION
Treated Volume | 1,022 m³ of contaminated soil |
Thermal technology | In-Situ Treatment |
Main contaminant | Hydrocarbons |
| Site challenges |
groundwater layer below the treatment zone
|
Project Timeline | 2017 - 2018 |

SOLUTION
Treatment Method |
In-Situ treatment using 63heating tubes |
Treatment program | Target temperature 220°C for 113 days |
Contaminated Vapors Management | Reburn |
Process control | Continuous temperature monitoring into the soil throughout the treatment |

RESULTS
✅ Achieved a 99.2% contaminant removal rate |
✅ final concentrations were below the detection limit (<20 mg/kg) |
✅ Emission standards were maintained throughout the project |