Site description
Treated volume3,648 m³of contaminated soil (6,564 t)
Thermal technologyIn-Situ Thermal Treatment
Main contaminantTrichloroethylene (TCE)
Site challengesUrban brownfield with a very low cleanup target (<1 mg/kg)
Project timelineJanuary – May 2025

Solution
- Treatment methodIn-situ thermal treatment
- Treatment program135 heating tubes, 135 Smart Burners and 11 MPE wells
- Contaminated vapour managementExtraction through the MPE wells, treatment in VTU/CTU before discharge
- Process controlThermocouples for continuous subsurface temperature control

Results
99%of TCE removed from the soil
3,648 m³treated soil volume
Remaining hot spot scheduled for excavation to meet the <1 mg/kg target

Reference sheet
Technical summary of this project, sent on request.