Thermal Eradication of Japanese Knotweed in a Port Environment (North Sea Port)

Demonstration project for North Sea Port in Ghent, Belgium, showcasing the effectiveness of In-Situ Thermal Treatment (ISTT) for Japanese knotweed eradication in a complex industrial environment. The project combined in-situ and wrapped excavation techniques while validating the compatibility of thermal treatment with underground utility infrastructure.

Site description

Treated area98 m²in one batch
Thermal technologyIn-Situ Thermal Treatment (Hot Screws)
Target speciesJapanese knotweed (Fallopia japonica)
Site challengesPort area with many utility lines; part treated in situ, part excavated and wrapped
Treatment periodMay – June 2025
Project site

Solution

  • Treatment methodIn-situ heating and treatment of excavated, wrapped soil
  • Heating configuration66 Hot Screws
  • Treatment targetMinimum 50°C for 3 days
  • Process controlThermocouples at 0.5, 1 and 1.5 m depth and handheld thermometer at 15 points
Treatment on site

Results

14 daystreatment time
Impact on electricity and telecommunication cables tested with Fluvius and Proximus
Site monitored by North Sea Port for two years
Site during or after treatment

Reference sheet

Technical summary of this project, sent on request.