A 25 m² pilot treated a 5.5 m-thick PCB-impacted zone, including wet and highly saturated soils, using 14 heating tubes and continuous monitoring over 63 days, with the objective of reducing PCB concentrations from up to 5,900 mg/kg to below 10 mg/kg.