A 5,850 m³ contaminated zone was treated with 33 propane-fired Smart Burners over 70 days, reaching 85°C at cold points and reducing chlorinated VOC concentrations in soil gas from up to 142,000 µg/m³ to below the 15,000 µg/m³ target, with cleanup objectives achieved down to 13 m depth.